[Spacewalk-list] Failed Repository Scheduled Sync - Deleted Repository
Speagle, Andy
andy.speagle at wichita.edu
Thu Jan 20 16:36:12 UTC 2011
Hi Team,
I'm using SPWK v1.2 ... and I like how the channel repository sync schedules work via the WebUI. However, I recently deleted and recreated a repository for which I had a scheduled daily sync and now every morning I get 2 messages. First, about the failure to sync for the repository that was deleted:
Taskomatic bunch repo-sync-bunch was scheduled to run within the repo-sync-1-731 schedule.
Subtask repo-sync failed.
For more information check /var/lib/rhn/tasko/org1/repo-sync-bunch/repo-sync_406623_err.
And another messages for what I suspect is the recreated repository of the same name:
Taskomatic bunch repo-sync-bunch was scheduled to run within the repo-sync-1-716 schedule.
Subtask repo-sync finished successfuly and is back to normal.
The logfile referenced by the first message contains this:
2011-01-20 06:00:10,012 [DefaultQuartzScheduler_Worker-3] ERROR com.redhat.rhn.taskomatic.task.RepoSyncTask - No such channel with channel_id 731
2011-01-20 06:00:10,012 [DefaultQuartzScheduler_Worker-3] ERROR com.redhat.rhn.taskomatic.task.RepoSyncTask -
I'm not certain how to go about removing this schedule manually from the scheduler. Can someone clue me in? Should this be filed as a bug?
Andy Speagle
System & Storage Administrator
UCATS - Wichita State University
P: 316.978.3869
C: 316.617.2431
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://listman.redhat.com/archives/spacewalk-list/attachments/20110120/5a98a400/attachment.htm>
More information about the Spacewalk-list
mailing list